With works in progress at our Gresham Street Project, in this article we demonstrate the extensive groundworks involved with this project in the City of London.

 

Our dedicated team of skilled workers marked out the new roof metal staircases position and completed the break-out of the existing RC slab in accordance with the engineers’ and architects’ setting out position.

The hole was covered for safety and to prevent water ingress into the building.

In line with current covid-19 government guidelines and wearing full PPE equipment, our team supplied the concrete pump from street level and connected into the static line into and along the basement. The above photo shows the concrete of the new RC slab over drainage trenches.

The photo above shows the installation of the new RC slab with Ancon MBT Couplers and hydrophilic strip around and over the drainage trenches in accordance with the engineers’ specifications.

We marked out the new trenches position for the new below-ground drainage. The existing rebars were bent and the Hi-Vis Safety rebar end cap protection was installed.

Digging out and tunnelling below existing RC beams to allow new drainage runs pass through. Finally, we completed the supply and installation of drainage runs with 10mm pea shingle and new RC chambers as per the engineers’ specifications.

At Shaca Construction, we have successfully completed many similar projects in London.  Groundworks and reinforced concrete account for approximately half of Shaca’s turnover and we have been successful with many new build groundworks schemes, including underpinning schemes, basements, and swimming pools.

For further details of our services, please send an email to: enquiries@shaca.co.uk.

 

 

April 9, 2020 - Comments Off on Stephenson House Project – London

Stephenson House Project – London

Our project at Stephenson House in London is progressing well.  The project involves internal structural works and groundworks in this redevelopment of an office building into a mixed-use scheme.

The work has so far involved the following:

  • Breaking out columns
  • Preparing the concrete slab for re-casting of the basement slab
  • Removing the large ground obstruction and preparing to mass fill with concrete to reinstate the slab.

 

Ground works and reinforced concrete account for a large proportion of Shaca’s turnover and we have successfully completed many new build groundworks schemes.  Examples of the schemes include underpinning works, basements and swimming pools.

Many of our projects are in very challenging central London sites with restricted access and often within/below existing buildings.

If your organisation requires similar groundworks, please feel free to get in touch.

Enquiries@shaca.co.uk

+44 (0) 1923 630 100

February 5, 2020 - Comments Off on Goswell Road Project in collaboration with Willmott Dixon

Goswell Road Project in collaboration with Willmott Dixon

 

Works are well underway at our Goswell Road project where we’re collaborating with Willmott Dixon.

Our photos show progress on the new ground floor pile caps and lift share area on rebar installation.

Groundworks and reinforced concrete account for about half of Shaca’s turnover and we have successfully completed many new build groundworks schemes, including underpinning schemes, basements and swimming pools.

Many of our projects are in very challenging central London sites with restricted access and often within / below existing buildings.

If you have a similar project you would like to discuss with us, please feel free to get in touch by email: enquiries@shaca.co.uk or call +44 (0) 1923 630 100.