SHACA CONSTRUCTION LTD

Original Image

shaca construction ltd

Experts in structural alterations and builders work packages.

est. 2000

Providing first class
service
in construction
projects.

Shaca Construction Limited have been operating within the London construction sector for over 20 years. We specialise in the refurbishment market, or more commonly known as, “cut and carve”, where projects are structurally complex and logistically challenging. We understand our clients’ requirements and often partner with main contractors or end users to safely and competently exceed their expectations.

what we do.

what we build

recent projects.

dEMOLITION, uNDERPINNING

EMD WALTHAMSTOW.

Our team successfully carried out a range of tasks in a grade two listed auditorium. We demolished a four-storey superstructure using a 22-tonne high reach excavator, skillfully navigating the presence of a live substation and nearby retail units. Our responsibilities included piling for the external extension areas, underpinning within the existing auditorium, and constructing ground beams and RC slabs. Additionally, we efficiently completed metal decking, reinforcement, and concrete works for the newly suspended upper floor slabs.

Value
£3 Million
DURATION
48 WEEKS
dEMOLITION, uNDERPINNING

maslows.

We demolished a six-storey cantilever staircase and installed new staircases using a stairmaster system. Our scope also included constructing a new duplex lift shaft and drainage scheme. Shaca handled glazing, white facing brickwork, blockwork, structural steelwork, and timber floor infills for a two-storey building extension. Additionally, we completed intumescent painting on the new steelwork and designed and installed temporary works for our project.

Value
£2 Million
DURATION
36 WEEKS
STEELWORKS, DEMOLITION

ST HELEN'S PLACE.

We extended and refurbished the building, demolishing the existing fifth floor and constructing new fifth and sixth floors and a rear core. We also made internal and external alterations, extended the rear of the building, and completed various tasks, including installing 21 new piles, demolition work, constructing a new basement with underpinning, and implementing temporary works such as façade retention through propping and temporary steelwork. Additionally, we were responsible for timber concrete infills and all builders’ work.

Value
£1.45 Million
DURATION
48 WEEKS
dEMOLITION, uNDERPINNING

BELGRAVIA PROJECT.

We performed structural alterations in reinforced concrete and grade two listed masonry, including designing and installing temporary works. Our team skillfully matched the facing brickwork to the existing grade two masonry. Moreover, we relocated a 15-tonne grade one listed marble-clad staircase within the building. This process involved designing custom lifting equipment, installing propping, cutting, lifting, lowering the stair flights onto air skates, moving them to the new location, and lifting them into their final position.

Value
£4 Million
DURATION
48 WEEKS